Private beta · On the Connect IQ store

Your crew, your spots, your records.

eFoilCrew is where eFoil riders keep their sessions, share the spots they ride, and find the people riding near them. Bring rides in from any GPX or FIT file, or install our Garmin app and each session arrives on its own, recorded the way a foil ride actually works.

The tour is a real rider's season. No account needed.

Home, with a Lake Union session
A Lake Union session with its board telemetry
The Lake Union spot sheet with conditions and forecast
2,000+eFoil rides
17,200Miles ridden
1,730Hours on the water
1,200Hours up on foil
8Rides a month, per rider
100+Spots ridden
Sessions

Every session logged, analyzed, visualized.

A session is more than a distance and a time. eFoilCrew keeps the track, the analysis, the conditions you rode in and the gear you rode on, together in one place instead of scattered across apps.

A logbook that holds the whole ride

Drop in GPX or FIT from any GPS device, or install the eFoilCrew app on a Garmin watch and each ride uploads itself. Browse by month, season or spot. Riders bring their back catalog with them when they join.

  • Any GPX or FIT file, from any watch, phone or tracker
  • De-duplication across devices, so one ride stays one ride
  • Top speed from the device's own speed sensor where it has one, so GPS jitter does not turn into a top speed
  • Full track replay with speed and time on foil alongside
  • Lifetime and season totals across the top of your home page, with a year of activity at a glance
  • Your crew's rides land beside your own, so you can see who has been out this week
  • Spots ranked by how much they actually get ridden, not how well known they are
The sessions screen
Replay and analyze

Watch the track play back

Open any ride and play the whole track across the map, then go into speed, time on foil, runs and the rest. A session stops being a row in a list and becomes something you can actually look at again.

  • Scrub or play the track back at speed
  • Speed and time on foil charted from the same track
  • Heart rate and weather from the same session, in the analysis tab

Track replay

Play any ride back on the map with speed and time on foil alongside.

Session analysis

Speed distribution, runs, time on foil, off-power glide.

Heatmaps

Where people ride, by spot and season.

Gear garage

Setups from a 225-product catalog, attached per ride.

Battery and range

How far each setup goes on a pack, learned from real rides.

Season insights

Training load, fitness and fatigue across a season.

Ask your data

Plain-language questions against your own rides.

Session photos

The shot from the water, attached to the ride it came from.

Insights and data

A season, not just a session.

Every ride feeds the same picture: when you go out, where, how hard, and what it is doing to your fitness over a year.

The Insights sessions tab: activity by day and time, a year heatmap and session filters

PatternsWhen you actually ride, by day and hour, with a year heatmap and filters across every session.

The Insights health tab: a training calendar, fitness and fatigue trend and weekly load

Load and fitnessA training calendar, a lifetime fitness and fatigue trend, and weekly load across a whole season.

The insights overview: progress, Ask your data and an AI recap

Season recapYour totals, plain-language questions about your own sessions, and a written read on how you are riding.

The watch app

An eFoil activity for your Garmin watch.

The eFoilCrew app records the numbers that matter on a foil, and the session uploads itself to efoilcrew.com when you stop. Before you launch it shows the spot and the setup you are riding. It is on the Connect IQ store, and it is optional: any GPX or FIT file works just as well.

Why a dedicated app

Ride stats made for foiling.

A foil session breaks into runs, falls and restarts, and the app measures it that way. When you stop, the session is already on efoilcrew.com, attached to the spot and the setup you chose before launching.

  • Detects when you are up on foil, and splits the ride into runs
  • Knows which spot you are at and how many sessions you have logged there
  • Pick the board and pack on the wrist, and the session arrives already labelled
  • Uploads itself through your phone when you stop, retrying if you are out of range
  • Estimates the distance, bearing and battery to get back to your launch
DISTANCE4.7ELAPSED TIME45:18HEART RATE142SPEED24.6TIME OF DAY14:23

The ride screen, as it looks mid-session.

The screens

What the watch shows
EST BATTERY28%DIST HOME2.3BATT HOME18.4%DIR HOMENNERANGE EST2.8TIME HOME11:41
On the waterGet home

Distance, bearing and time back to your launch, with an estimate of the battery it will take.

Lake UnionSPOT SESSIONS47SPOT DISTANCE358GEAR NAMELift X / 170 HA
Before you launchSpot info

Which spot you are at, how many sessions you have logged here, how far you have ridden it, and the setup selected.

TOTAL RIDES512TOTAL TIME503hLIFETIME DISTANCE6,140DAY STREAK23
Before you launchLifetime

Total rides, total time, lifetime distance and day streak, without reaching for a phone.

It's online before you're back at the car

End the ride and the session starts uploading through your phone on its own, retrying if you walk out of range. By the time your gear is packed up the session is on efoilcrew.com: spot, gear, full analysis and the replay ready for you to review or share.

Available on the Garmin Connect IQ store

Eight supported models, $199 to $749. Which one should you buy?

Planned iOS and Android apps are planned. Tick the box on the access form and we will tell you when there is something to install.
Riders and spots

Ride new water. Ride it with other people.

Every spot has its own page: the conditions, the sessions logged there and the riders who go back to it. Follow a few of them and their rides show up alongside yours.

Know the water before you drive to it

Open a spot and you get what it is like right now and what it has been like: temperature, wind and gusts, the hourly chart and a five-day forecast, alongside every session logged there and the riders who keep going back. Replay all of them at once to see where people actually ride.

  • Current conditions, hourly wind and a five-day forecast
  • Sessions, miles and who has been out recently
  • Replay every session at the spot in one go
The Lake Union spot sheet with conditions and forecast
Spots

Find new water

Each spot carries its conditions, its session history and the riders who go there. The one twenty minutes further on might be the better spot.

Riders near you

See who is out

Follow riders at your spot. Their sessions land on your home page, so you know who was on the water this week.

Local knowledge

Learn a spot from someone who knows it

Someone with fifty sessions at a spot has ridden it in conditions you have not. You can see who that is, what they ride, and message them.

Events and check-ins

Turn up at the same time

Demo days, meets and local sessions with RSVPs, plus a heads-up when someone is heading to your spot.

Spot leaderboards

The board belongs to the spot

You ride the same water lap after lap, so the leaderboard belongs to the spot. The names on it are the people who launch next to you.

Records and badges

Something to chase

Records come from your track, not a form, and pass to whoever beats them. Badges are light touch.

For the industry

For dealers and for brands.

Dealers and shops

Customers who keep riding

We think a shop's best customer is the one still riding in their second season, and eFoilCrew is where that rider keeps their sessions. Run your demo day here: attendees RSVP on the event page, and your shop has a page of its own with your gear and contact details.

Talk to us about your shop
Brands and manufacturers

A clearer view of what happens after the sale

A board leaves the factory and what happens to it next is mostly invisible. Sessions that riders log are what could change that, though the aggregate view for brands is still on the roadmap rather than something you can use today. What is built is the catalog underneath it: 225 products and which parts fit together. We would like to fill in the gaps with you.

Talk to us about partnering
Request access

Get on the list.

eFoilCrew is in a private beta while the foundations get finished. We are letting people in a few at a time, riders who already record their sessions first.

Enter a valid email address.
Pick how you record, so we can work out where you are in the queue.

No spam, just an invite when it is your turn. Questions? hello@efoilcrew.com

Built in Seattle by Bernhard Kotzenberg, founder of FoilNexus LLC. LinkedIn Press enquiries Partner enquiries